The Evolution of Our DSS RC System
Click Photos to Enlarge
AUAV'S 2nd Prototype DSS System
Feb. 2002
AUAV'S First Prototype DSS System
Jan. 2002
AUAV'S Production DSS System
Nov. 2002
Flying AUAV's First Prototype DSS
RC System Jan. 2002
Flying AUAV 2nd Prototype DSS
RC System Oct. 2002
Flying One Of AUAV's Production DSS
RC System Oct. 2002
Flying One Of AUAV's Production DSS
RC System Oct. 2002
AUAV 's 2nd Prototype DSS System In
The Single Boom Pusher DSS RC System
Test Bed Note The 72 MHz Back Up Radio 2002
AUAV 's 2nd Prototype DSS System In
The Single Boom Pusher DSS RC System
Test Bed Note The 72 MHz Back Up Radio 2002
Fred Marks of FMA talking to
Dave Jones of AUAV
while test flying the DSS System,
November 2003
Fred Marks of FMA test flying
one of AUAV 's DSS Systems.
November 2003
Fred on the low flyby with AUAV's DSS System
November 2003
Fred on approach for a low flyby with AUAV 's DSS System
November 2003